6 lines. 100+ km. Mumbai's air-conditioned answer to traffic gridlock. Every metro line — operational, new and coming soon — explained with an interactive map anyone can understand.
Line 1 BlueLine 2A YellowLine 3 Aqua 🚇Line 7 RedLine 9 NEWLine 2B NEW
101
km Operational
6
Active Lines
142+
Stations
1.5M+
Daily Riders
₹10
Min. Fare
27
Line 3 Stations
Interactive Schematic Map
All Mumbai Metro Lines — Tap Any Station
Tap a station circle for details
Line 1 Blue — Versova to Ghatkopar
Line 2A Yellow — Dahisar to DN Nagar
Line 7 Red — Dahisar E to Gundavali
Line 3 Aqua — Underground
Lines 9 & 2B NEW APR 2026
Lines 4, 6, 5 — Under Construction
Operational Lines — April 2026
Mumbai Metro — All Active Lines Explained
Think of each line like a coloured road in the sky (or underground!). Each has its own colour, two end stations, and stops in between.
1
Fully Operational · 2014
Line 1 — Blue Line
Versova ↔ Ghatkopar
11.4
km
12
Stations
21
min end-to-end
Mumbai's first metro (2014). Runs east-west — the only rapid transit link connecting western suburbs (Versova/Andheri) to eastern suburbs (Ghatkopar/Central Railway) in just 21 minutes. A 45-min cab ride now takes 21 minutes.
Runs parallel to the Western Railway on the western side — Dahisar in the north to DN Nagar (Andheri West), interchanging with Line 1. Great for north-western suburb commuters who want to avoid local train crowds.
Mumbai's first and only fully underground metro — 26 of 27 stations are underground! Connects Aarey (Goregaon north) to Cuffe Parade (south Mumbai), passing through the airport (T1 + T2), BKC, Dadar, Worli, Churchgate and CSMT.
Runs parallel to Western Railway on the eastern side (Western Express Highway corridor) — from Dahisar East to Andheri East (Gundavali), interchanging with Line 1. Now extended north as Line 9 toward Mira-Bhayandar.
Opened April 7, 2026 — Mumbai's newest metro! Extends Line 7 northward from Dahisar East into the Mira-Bhayandar region, giving the city's northern outskirts metro access for the first time. Eventually connects to Mira Road.
Dahisar East 🔄KashigaonMore phases coming…
2B
NEW · 7 April 2026 🆕
Line 2B — Yellow (East)
Diamond Garden ↔ Mandale
5.4
km Phase 1
5
Stations
23.6
km full
Opened April 7, 2026 — the eastern arm of the Yellow Line. Connects Chembur (Diamond Garden) to Mandale, bringing metro to the Harbour Line zone. When the full 2B opens, it will run from DN Nagar through Bandra, BKC to Mandale — a true east-west crosser.
Diamond GardenChembur areaMandaleDN Nagar end (planned)
Key Interchange Stations
Where Lines Meet — Interchange Guide
These are the stations where you can switch from one metro line to another — or to a local train — without going outside.
Station
Lines That Meet
Why It Matters
Marol Naka
Line 1 BlueLine 3 Aqua
The most critical metro interchange — connect east-west (L1) with north-south underground (L3). The airport, BKC, CSMT and Cuffe Parade all become easily accessible from here.
DN Nagar
Line 1 BlueLine 2A Yellow
Switch between the east-west Line 1 and the north-south Line 2A here. Andheri West commuters can go east to Ghatkopar without a cab.
Gundavali / WEH
Line 1 BlueLine 7 Red
Switch between Line 1 and Line 7 on the Western Express Highway. Andheri East commuters from northern suburbs can connect to Versova or Ghatkopar.
Dahisar East
Line 7 RedLine 9
Hub for the northern metro extension — Line 7 and new Line 9 meet here, plus easy access to WR Dahisar and the bus network to Mira Road.
Ghatkopar
Line 1 BlueCentral Railway 🚂
The metro's eastern gateway — swap to CR local at Ghatkopar and reach CSMT, Dadar, Thane or Kasara without a cab. Game-changer for eastern suburb commuters.
CSMT (Metro)
Line 3 AquaCR + Harbour 🚂
The south Mumbai mega-hub. Aqua Line 3's underground station below CSMT connects directly to Central Railway and Harbour Line local trains above.
Ticket Prices 2026
Mumbai Metro Fares — Complete Guide
All lines use distance-based fares. Smart card = 10% off every journey. Buy tickets at any station kiosk or via the Mumbai 1 app.
Metro Line
Minimum Fare
Maximum Fare
Smart Card Discount
Frequency
Line 1 Blue
₹10
₹40
10% off
4–5 min
Line 2A Yellow
₹10
₹50
10% off
6–8 min
Line 3 Aqua 🚇
₹10
₹80
10% off
3–4 min
Line 7 Red
₹10
₹50
10% off
6–8 min
Line 9 (new)
₹10
₹40
10% off
TBD
Line 2B (new)
₹10
₹40
10% off
9–10 min
💳
Smart Card = Best Value — Always
A Mumbai Metro Smart Card (₹50 refundable deposit at any station) gives 10% off every ride across all lines. Top up at kiosks, customer service, or via the Mumbai 1 app. QR code tickets are also available via Paytm, PhonePe and Amazon Pay — no token queue needed.
Under Construction — 2026 & Beyond
Mumbai Metro Lines Coming Soon
When all planned lines are complete, Mumbai will have 300+ km of metro — transforming how 20 million people move.
Expected 2026
Line 4 — Green Line
Bhakti Park (Wadala) ↔ Kasarvadavali
32.32 km · 32 stations · Via Ghatkopar, Thane — this massive north-south corridor will finally link Mumbai's eastern waterfront to Thane city, giving the eastern suburbs their own metro spine. Phased opening expected 2026.
Expected Mid-2026
Line 6 — Pink Line
Lokhandwala (Andheri W) ↔ Kanjurmarg
14.47 km · 13 stations · The JVLR corridor — finally connecting Andheri West with Powai, SEEPZ and Kanjurmarg. Will interchange with Line 3 at SEEPZ, creating a key east-west junction. Highly awaited by Powai and Kanjurmarg residents.
Under Construction
Line 5 — Orange Line
Thane ↔ Bhiwandi ↔ Kalyan
23.5 km · 17 stations · Connects Thane to Kalyan via Bhiwandi. Opens the entire Bhiwandi logistics corridor — one of Asia's biggest warehousing zones — to rapid transit. Phased construction ongoing.
Expected end-2026
Line 7A — Red Line Extension
Andheri East ↔ Airport T2
3.17 km · 3 stations · Short but critical extension that will be the third metro connection to CSMIA Airport (T2). Cuts travel time from Mira-Bhayandar and northern suburbs to the airport by up to 60 minutes. 59%+ complete as of April 2026.
Commuter Tips
Mumbai Metro — Insider Tips
🚇
Line 3 Aqua = Airport Made Easy
Airport T1 and T2 are both directly on Line 3. No cab stress, no traffic. Just metro — and it runs right under the city. Most reliable airport route in Mumbai.
💼
BKC Finally Accessible
Before Line 3, BKC (Bandra-Kurla Complex) was notoriously hard to reach without a cab. Now Line 3 stops right there. A 40–90 min cab ride from Andheri is now a 20 min metro ride.
🔄
Marol Naka = The Power Junction
This one station connects the east-west Line 1 with the north-south underground Line 3. From here you can reach Versova, Ghatkopar, Airport, BKC, CSMT or Cuffe Parade.
💳
Smart Card at Entry = No Queue
Token queues pile up at peak hours. Smart card users tap and enter instantly. Get one from any metro station for ₹50 deposit. Recharge at kiosks or the Mumbai 1 app.
⏱️
Last Train Before 11 PM
Most metro lines end around 11 PM. Line 3 is approximately 11:00–11:30 PM last train. Plan your evening accordingly — don't miss the last train and need an Uber from Aarey!
👩
First Coach Reserved for Women
The first coach on all metro lines is reserved for women passengers during peak hours. Less crowded and always available — a great option for solo female commuters.
🧳
Luggage? Metro is Fine
Standard luggage allowed on metro at no extra charge — great for airport runs. Just avoid giant suitcases in rush hour. Overhead shelves are available in most coaches.
📱
Mumbai 1 App for Everything
The Mumbai 1 app covers all metro lines — ticket booking, route planning, smart card recharge, real-time train information. Download before your first metro trip.
Also Explore Mumbai Local Trains
Western, Central and Harbour lines — complete guide with interactive map.
As of April 2026, Mumbai has 6 operational metro lines: Line 1 Blue (Versova–Ghatkopar, 11.4 km), Line 2A Yellow (Dahisar–DN Nagar, 18.6 km), Line 3 Aqua (Aarey–Cuffe Parade, 33.5 km, fully underground), Line 7 Red (Dahisar East–Gundavali, 16.5 km), Line 9 Phase 1 (new April 2026), and Line 2B Phase 1 (new April 2026). Total operational network: 101+ km.
Mumbai Metro Line 3 (Aqua Line) connects directly to Chhatrapati Shivaji Maharaj International Airport — it has stations at both Terminal 1 (T1) and Terminal 2 (T2). It is the fastest and most reliable way to reach the airport from BKC, Andheri, Marol, Dadar or CSMT. Line 7A (under construction, expected end-2026) will also add a third metro connection to T2.
Mumbai Metro Line 3, called the Aqua Line, is Mumbai's first fully underground metro. It runs 33.5 km with 27 stations from Aarey JVLR in the north to Cuffe Parade in South Mumbai. It became fully operational on October 8, 2025. Key stations include Marol Naka (Line 1 interchange), Airport T1 & T2, BKC, Dadar, Worli, Churchgate, CSMT, and Cuffe Parade. Operated by MMRCL.
Mumbai Metro Line 1 (Blue Line, east-west) and Line 3 (Aqua Line, north-south underground) interchange at Marol Naka station. This is the most important hub in Mumbai's metro network — from here you can reach Versova in the west, Ghatkopar in the east, the airport in the north, or BKC/Cuffe Parade in the south.
Mumbai Metro fares start at ₹10 for the shortest distance. Line 1 goes up to ₹40, Lines 2A and 7 up to ₹50, and Line 3 Aqua (longest line at 33.5 km) up to ₹80. Smart card holders get a 10% discount on all journeys on all lines. Tokens at ₹10 to ₹80 are available at station vending machines.
On April 7, 2026, two new metro sections were inaugurated by CM Devendra Fadnavis: Line 9 Phase 1 (Dahisar East to Kashigaon — Mumbai's first metro into the Mira-Bhayandar region) and Line 2B Phase 1 (Mandale to Diamond Garden in Chembur — bringing metro connectivity to the Harbour Line area for the first time).
Line 1 first train: 5:30 AM from Versova and Ghatkopar. Line 2A and Line 7 first trains: 6:00 AM. Line 3 Aqua Line first train: 6:00 AM from both Aarey and Cuffe Parade. Last trains on most lines run until 11:00 PM. Line 3 last train is approximately 11:00–11:30 PM. Always check the Mumbai 1 app for latest timings.
Mumbai Metro tickets can be bought as: (1) Tokens from vending machines at any station (accepts cash, UPI, card), (2) QR code tickets via the Mumbai 1 app (no queue needed), (3) UPI payment via Paytm or PhonePe at machines, (4) Smart card at station service counter (₹50 refundable deposit, 10% discount on every ride). Smart card is recommended for frequent users.
Lines under construction in 2026: Line 4 Green (Bhakti Park Wadala to Kasarvadavali via Thane, 32.32 km — phased 2026 opening), Line 6 Pink (JVLR Lokhandwala to Kanjurmarg, 14.47 km — mid-2026), Line 5 Orange (Thane to Kalyan via Bhiwandi, 23.5 km), and Line 7A (Airport T2 extension, 3.17 km — end-2026). When all are complete, Mumbai will have 300+ km of metro.
The Mumbai Metro Smart Card is a prepaid contactless card available at any metro station counter for ₹50 refundable deposit. It works across all metro lines and gives 10% discount on every journey. Tap at entry gate → ride → tap at exit gate; fare is automatically deducted. Top up at station kiosks, customer service, or via the Mumbai 1 app. Recommended for all regular metro users.
Mumbai Metro 2026 — Complete Commuter Guide
Mumbai's metro network has transformed from a single 11-km east-west corridor in 2014 to a 101+ km network in 2026 — and the city is still building. Understanding how the lines connect, and which line takes you where, is the key to unlocking a faster, air-conditioned city.
Line 3 Aqua: The Line That Changed Everything
No single infrastructure project has changed Mumbai's commuting landscape as dramatically as Line 3. For decades, BKC was the city's most important business district and also its most inaccessible — a 40–90-minute cab ride from most of the city. Line 3's BKC station made this commute 20 minutes from Andheri. The airport, previously a traffic nightmare, now has direct metro access at both terminals. South Mumbai and North Mumbai — long separated by the city's spine of traffic — are now connected underground.
Lines 2A and 7: The WR Parallel Network
Line 2A (Yellow, on the west) and Line 7 (Red, on the east) run parallel to the Western Railway suburban corridor, offering an air-conditioned alternative to the packed local trains. They also interconnect with Line 1 at DN Nagar (2A) and Gundavali (L7), meaning a Dahisar resident can now reach Ghatkopar without a single traffic light. This is the transformation that metro lines create when they're planned as a network.
2026 and Beyond: 300 km of Metro
Mumbai's metro master plan envisions over 300 km of metro coverage. Lines 4, 5, 6, 7A, 8, 9 and others will collectively cover every major suburb from Mira-Bhayandar to Navi Mumbai, and connect both airports (CSMIA and the new NMIA) via Line 8 (Gold Line). By 2030, a Mumbaikar will be able to travel almost anywhere in the city — from the hills of Aarey to the shores of Cuffe Parade — without a single cab, rick, or traffic jam.